Some of the most important work on a new structure happens before the exterior takes shape. These photos follow the new construction process on one Preferred Construction Group project, from excavation through framing, roofing, windows, and sections of siding.


Laying the groundwork


The first photos show the building footprint taking shape. After excavation, forms and steel reinforcement were set for the concrete footings. Once the concrete work was in place, concrete block walls established the raised foundation. Seeing these stages side by side makes it easier to appreciate how much happens before a wall goes up.


Building the frame


Next came the wood floor framing, followed by the exterior walls and gable roof framing. At this stage, the structure's shape became clear: openings for windows and doors were visible, and the roofline began to define the building against the surrounding trees.


Shaping the exterior


Roof sheathing covered the rafters. Later photos show a shingled roof, house wrap, windows, and sections of vertical siding. Together, the images show how the exterior took shape over time.


A look at our Construction Photo Tour


This construction photo tour series ends at this stage of construction. It offers a look at the groundwork, framing, and exterior work behind a building project. If you're planning a construction project of your own, contact Preferred Construction Group to discuss your ideas.